§ 28-183. Scope. |
§ 28-184. Deposit and contract required. |
§ 28-185. Establishment of standards for pressures, quantities and quality. |
§ 28-186. Lighting of heating unit pilot. |
§ 28-187. Appliance and fixture inspection. |
§ 28-188. Application for change of rate; approval of Director. |
§ 28-189. City not required to recommend favorable rates. |
§ 28-190. Separate billing for each meter; billing for unmetered gas. |
§ 28-191. Residential gas service (schedule RS). |
§ 28-192. Residential gas peaking service (schedule RPS). |
§ 28-193. General gas service (schedule GS). |
§ 28-194. Large volume general gas service (schedule CIS). |
§ 28-195. Transportation service (schedule TS). |
§ 28-196. Transportation service (schedule TS2). |
§ 28-197. Propane-air gas service (schedule PA). |
§ 28-198. Municipal gas service (schedule MGS). |
§ 28-199. Flexibly priced interruptible gas service (schedule FS). |
§ 28-200. Unmetered gaslight service (schedule GL). |
§ 28-201. Gas air conditioning service (schedule AC). |
§ 28-202. Large volume gas sales service (schedule LVS). |
§ 28-203. Large volume, high load factor, gas sales services (schedule LVS-2). |
§ 28-204. Natural gas vehicle gas service. |
§§ 28-205—28-231. Reserved. |