Each owner that performs an excavation or causes an excavation to be performed in
the public right-of-way shall, within at least three business days after the excavation
is complete as determined by the Director of Public Works, maintain, repair or reconstruct
the site of the excavation as necessary to maintain a condition satisfactory to the
Director until such time as the City reconstructs, repaves or resurfaces the public
right-of-way.
(Code 2004, § 90-546; Ord. No. 2005-113-55, § 1, 4-25-2005;
Ord. No. 2019-314, § 1, 1-13-2020
)